12:37 - 25.06.2020
June 25, Fineko/abc.az. On 25 June 330 and 500 KV open switchgears, 8 power units, a dispatcher control center, main and auxiliary sections, buildings and structures of the ‘Azerbaijan’ Thermal Power Plant were put into operation after major reconstruction.
ABC.AZ reports that the event was attended by President Ilham Aliyev.
The head of state was informed about the conditions created at the station.
10 September 2026
10 September 2026
10 September 2026
10 September 2026
10 September 2026
10 September 2026
10 September 2026
8 September 2026
8 September 2026
8 September 2026
8 September 2026
9 September 2026
8 September 2026