12:45 - 23.09.2024
September 23, Fineko/abc.az. Azerenergy OJSC has signed an agreement with BCC Group CJSC for 17 million manats.
ABC.AZ reports that the agreement envisages construction of Chaykend-2 small hydroelectric power.
The cost of the agreement is 16,763,385 manats.
25 September 2026
25 September 2026
25 September 2026
25 September 2026
25 September 2026
25 September 2026
25 September 2026
25 September 2026
25 September 2026
23 September 2026
23 September 2026
23 September 2026
23 September 2026
23 September 2026
23 September 2026
23 September 2026