12:04 - 2.05.2018
May 2, Fineko/abc.az. Azerbaijani Railways (ADY) keeps on capital repairs of railway road Baku – Boyuk-Kesik.
ADY reports that from September 2016 Specialized Railway Company LLC #5 and #11 has carried out installation of new turnout switches.
"Overhaul of five switches on the two-track railway station Mingachevir is underway. Work will be conducted in stages. The process is fulfilled by SRC #11 staff," ADY said in a statement.
The first such switch was installed on 9 September 2016. To date, 150 switches have been installed.
8 July 2026
8 July 2026
7 July 2026
6 July 2026
6 July 2026