15:19 - 3.06.2020
June 3, Fineko/abc.az. The 110/35/6-KV substation ‘Terter’ has been put into operation today after reconstruction.
ABC.AZ reports that the event was attended by President Ilham Aliyev.
Azerishig’s chairman Vugar Ahmadov informed the head of state about the activities of the electric substation.
President Aliyev has put the substation into operation.
13 July 2026
14 July 2026