12:45 - 15.11.2022
November 15, Fineko/abc.az. Azeristiliktechizat, in coordination with the Ministry of Energy and the president’s special representative, constructed 7 boiler houses with capacity of 8110 kWh and one heat point in Shusha district.
ABC.AZ reports that acting chairman of Azeristiliktechizat, Ilham Mirzaliyev, stated about this at a briefing dedicated to the beginning of the autumn-winter season.
He noted that the reconstruction of intra-block, as well as intra-house heating and hot water supply systems of 16 buildings for various purposes has been completed and put into operation.
21 July 2026
21 July 2026
20 July 2026
20 July 2026