7 boiler houses with capacity of 8,110 kWh built in Shusha

12:45 - 15.11.2022


November 15, Fineko/abc.az. Azeristiliktechizat, in coordination with the Ministry of Energy and the president’s special representative, constructed 7 boiler houses with capacity of 8110 kWh and one heat point in Shusha district.

ABC.AZ reports that acting chairman of Azeristiliktechizat, Ilham Mirzaliyev, stated about this at a briefing dedicated to the beginning of the autumn-winter season.

He noted that the reconstruction of intra-block, as well as intra-house heating and hot water supply systems of 16 buildings for various purposes has been completed and put into operation.