12:36 - 3.04.2026
April 3, Fineko/abc.az. The Cabinet Ministers adopted a resolution on measures to designate the 81.3–km section of Ahmadbeyli–Fuzuli-Shusha highway under construction as a toll highway.
ABC.AZ informs that the decision was signed by Prime Minister Ali Asadov.
According to the decision, the starting point of the toll highway is the 157th kilometer of the M–6 Hajigabul–Bahramtepe–Minjivan highway, the ending point is the 100.5 km of the Ahmadbeyli-Fuzuli–Shusha highway (Victory Road).
The intersections and junctions of the toll highway with other highways are as follows:
-1.4 km of the toll highway – highway Goradiz–Jabrayil–Zangilan–Agbend;
-The 27th km of the toll highway is the access road to the Fuzuli International Airport;
-The 32nd km of the toll highway is the access road to the city of Fuzuli;
-on the 32nd, 47th and 67.5 km of the toll highway — Akhmedbeyli–Fuzuli-Shusha highway (Victory Road).
The technical category of the toll highway is I, the number of lanes: on the 0-46 km section – 6, on the 46-81.7 km section - 4; lane width – 3.5 m, shoulder width: on the 0-46 km section – 2.5 m, on the 46-81.7 km section – 2 m; width of the roadbed: on on the 0-46 km section – 29.5 m, on the 46-81.7 km section – 21.5 m; the width of the reinforced shoulder strip is 0.5 m, the width of the dividing strip is 2 m.
28 August 2026
28 August 2026
28 August 2026
28 August 2026
28 August 2026
28 August 2026
28 August 2026
28 August 2026
26 August 2026
26 August 2026